A. JUR GSF a 300 ft drilling unit

This unit was in cold storage for two years in Malaysia and various Engineering scopes were carried out for reactivating the rig.

  1. Fast Rescue craft installation
  2. Helifuel Tank Storage
  3. Extension of Accommodation deck to install an Accommodation container
  4. 60T SWL Panama chock on port & stbd side
  5. Gymnasium
  6. Choke & Kill line platform
  7. Crew Baggage iwo Helideck
  8. Substructure repair plan & FE analysis
  9. Shaker Deck analysis
  10. Centrifuge Deck analysis

B. JUR GSF a 300 ft drilling unit

JUR CD a Marathon Letourneau 116􀀂C design jack􀀂up drilling unit built in year 1992 required a number of modifications for deployment in the field.

Works carried out

  1. Strength Calculation of Platform for the loads of OSU􀀂PA unit
  2. Calculation of SWL of Trolley Beams of BOP
  3. Trolley Beam in pump room
  4. Installation of Escape route from derrick
  5. Installation of a walkway to reach Monkey Board